So, how to draw up a work plan to repair the house? The list of types of work, in order of their implementation is presented below:
1. First of all, held the most "dirty" work. This dismantling of the old wall and floor coverings, garbage disposal and cleaning of dust and dirt.
2. The second step should be the floor leveling.
3. The next step is to install plumbing and heating pipes and electrical wiring.
4. Rough finish - plastering walls and for leveling the surface of the preparation for the application of the topcoat.
5. finishing.